HomeMy WebLinkAbout2022-12-02FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 12/2/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items
2 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Punch list
- analyzers and sample panels
3 Daniel Ford No 95-OPERATIONS
BUILDING
- punch list
4 Daniel Ford No 00-GENERAL -We are installing the letters for the monument wall. sacking
and packing around the site
5 Daniel Ford No 50-RO/UV BUILDING - We are putting together the challenge test
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement mason
Daniel Sheslingoff
Created By: Daniel Ford
3 24.0
FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:37 PM PST
Manpower Log's Attachments:
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
47°F 56°F 52°F 0.86 in.0.86 in.0.86 in.70%81%92%46°F 5.0 mph 11 mph 21 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
No Description
54°F
No Description
53°F
No Description
49°F
No Description
48°F
No Description
52°F
No Description
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 02:15:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:37 PM PST