Loading...
HomeMy WebLinkAbout2022-12-02FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 12/2/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list - analyzers and sample panels 3 Daniel Ford No 95-OPERATIONS BUILDING - punch list 4 Daniel Ford No 00-GENERAL -We are installing the letters for the monument wall. sacking and packing around the site 5 Daniel Ford No 50-RO/UV BUILDING - We are putting together the challenge test   MANPOWER LOG 3 Workers  |   24.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Ricardo Belmontes Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement mason Daniel Sheslingoff Created By:  Daniel Ford       3  24.0      FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:37 PM PST        Manpower Log's Attachments:    WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 56°F 52°F 0.86 in.0.86 in.0.86 in.70%81%92%46°F 5.0 mph 11 mph 21 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM No Description   54°F No Description   53°F No Description   49°F No Description   48°F No Description   52°F No Description   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 02:15:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:37 PM PST