HomeMy WebLinkAboutReso 26-24 Master Fee schedule 2024-25RESOLUTION NO. 26-24
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF MORRO BAY, CALIFORNIA,
ADOPTING FISCAL YEAR 2024-25 MASTER FEE SCHEDULE
THE CITY COUNCIL
City of Morro Bay, California
WHEREAS, the City Council finds fees and charges for City services are annually in
need of review for possible updating to reflect changes in the cost of providing those services;
and
WHEREAS, pursuant to the California Constitution, with certain exceptions, if a City Fee
exceeds the City's cost for providing the service covered by that fee, that fee is considered a tax;
and
WHEREAS, the City has reviewed the attached fees, and finds they do not exceed the
actual costs of providing related services when that limitation is applicable; and
WHEREAS, on April 12, 2022, City Council adopted Resolution No. 33-22, specifying
that the annual adjustment indices applicable to the Master Fee Schedule are the Los Angeles -
Long Beach -Anaheim CPI published by the Bureau of Labor Statistics and the State's
Construction Cost Index that is produced by the Department of General Services; and
WHEREAS, the City Council adopted Resolution 26-23 approving the Fiscal Year (FY)
2023-24 Master Fee Schedule on April 25, 2023; and
WHEREAS, based upon continuing economic impacts due to the COVID-19 Pandemic
and other factors, commercial fishing slip fees increased from $7.10/foot to $8/foot on October 1,
2022, and annual increases will be instituted on this fee annually for the next 10 years following
2022 using the December to December Los Angeles -Long Beach -Anaheim CPI, rounded to the
nearest dollar. Moreover, in consideration for this reduced (compared to market) commercial
fishing slip fee schedule, Morro Bay Commercial Fishermen's Organization agrees to provide a
$100,000 in grant funds awarded by Central California Joint Cable Fisheries to the City once a
construction project on the docks and piers move forward; and
WHEREAS, California Government Code sections 66000, et seq., mandate numerous
detailed and stringent requirements for all development fees levied by local government on new
construction projects; and
WHEREAS, Section 66017 of the California Government Code requires a 60-day
"waiting period" before any development fee increase can become effective; and
WHEREAS, pursuant to Government Code section 66016, et seq., specific fees to be
charged for services must be adopted by City Council resolution or ordinance, after providing
notice and holding a public hearing; and
WHEREAS, the City's Municipal Code Section 3.34.020 (Fee revisions and reviews),
states: "Any fees, included in the Master Fee Schedule, may be reviewed, and revised annually
by the city council. The City's cost of providing the services shall be computed and reflected in
these fees. The fees shall then be enumerated, and the revised Master Fee Schedule adopted
by resolution of the City Council."
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Morro Bay,
California, as follows:
SECTION 1. Effective July 1, 2024, Resolution No. 26-23 shall be rescinded.
SECTION 2. Effective July 1, 2024, the Fiscal Year 2024-25 Master Fee Schedule,
attached hereto and incorporated herein by reference, is hereby amended and readopted
adopted.
PASSED AND ADOPTED by the City Council of the City of Morro Bay at a regular meeting
thereof held on the 231 day of April 2024, by the following vote:
AYES: Wixom, Barton, Edwards, Ford, Landrum
NOES: None
ABSENT: None
ABSTAIN: None
RECUSED: None
CAR IXOM, Mayor
ATTEST:
Master Fee Schedule
Fiscal Year 2024-25
Table of Contents
General.................................................. 1
Finance.................................................. 1
Community Development ...................... 2
Public Works .......................................... 7
Police..................................................... 10
Fire......................................................... 12
Harbor.................................................... 14
Recreation .............................................. 16
Transit & Trolley ..................................... 19
Effective July 1, 2024
City of Morro Bay
Unless noted below, the City's adopted fee schedule is adjusted annually by the All Urban Consumer Price Index (CPI), Los Angeles area,
based on the December 2023 12-month change. This represents 3.5% for the FY 2024-25 Fee Schedule.
Impact fees are adjusted annually by the California Construction Cost Index (CCCI) rate, based on the December 2023 12-month change.
This represents 9.4% for the FY 2024-25 Fee Schedule.
All fees of $1.00 or greater that are not in per foot or square footage units are rounded to the nearest dollar.
Fees that are limited by State law or that were already at 100% cost recovery were not increased.
Fees in the schedule are effective as of July 1, 2024.
Photocopies per page (unless otherwise defined)
Photocopies (per 11" x 17" page)
Copies -Digital - per device
Certified Copies of City Documents
Records Request (retrieval of FPPC filings 5 or more years old)
Print material mailed
Refundable appeal fee for non -land use administrative decisions
(Estimated Cost of Appeal is S3,690. The $336 appeal fee denotes 9.1% of cost recovery).
Elections filing fee - Notice of intention to circulate petition
This amount is refundable under Elections Code Section 9202(b), with conditions (limited by State law).
Candidate Filing Fee per canditate
(limited by State law).
Budget document, per copy
City audit document, per copy
Master Fee Schedule
Business Tax Schedule
Business License Processing Fees
Business License - New
Business License- Renewal
Insufficient Funds Charge
(per CA Civil Code Section 1719; now_
First instance of insufficient funds
Second and subsequent instances
$ sl
Actual Cost
$ 336
$ 200
25
I Actual Cost of outside company to print and
bind or Copies Printed fee at:
$0.40 per page (Letter and Legal size)
$0.70 per page - Tabloid sized paper
1 Actual cost of outside company to print and
bird or Copies Printed fee at:
$0.40 per page (Letter and Legal size)
$0.70 per page -Tabloitl sized paper
Actual cast of outside company to print and
bind or Copies Printed fee at:
$0.40 per page (Letter and Legal size)
$0.70 per page-Tablaid sized paper.
Actual cost of outside company to print and
bud or Copies Printed fee at
$0.40 per page (Letter and Legal size)
$0.70 per page -Tabloid sized paper
$ 37
$ 18
$ 25
Effective July 1, 2024 Page 1 of 19
Utility Billing
Water service application fee per account (MBMC13.04.1OD)
Physical posting of shut-off notice at customer location
Refundable/transferable deposit- residential tenants only on signup (MBMC13.04.220)
Deposit required for service termination for delinquent non-payment (residential tenants only, if a deposit has not previously
been collected)
S
Reconnection
Ruildinn nivicinn
N
58
43
100
100
103
Valuation: from $1 - $3,000 (including electrical service less than 600 amp, and minor plumbing alternatives)
$ 205
.026 x total valuation as determined by
Valuation: from $3,001 to $1,000,000
the Building Official (50%
submittal at issuance
_
.0075 x portion of valuation over
Valuation: applies to portion above $1,000.000
$1,000,000 as determined by the
Building Official (50% submittal/ 50%
at issuance)
Construction Operation After Hours
$ 91
Building Re -Address Processing
S 72
Demo Commercial
S 273
Demo Residential
$ 182
In -lieu Housing Fee (if unit not affordable housing) - per square foot
$ 0,45
8% surcharge on all Building Permits
General Plan Maintenance
I.T. Service Fee
.0075 x valuation (valuation capped at
$1,000,000)
SMIP Category I (Residential)
.00013 x valuation
SMIP Category II (Commercial)
.00028 x valuation
Unsafe Building repair, demolition or moving structure
Charged at Cost
Inspection Fees - outside of normal work hours - per hour, 2 hour minimum
Fully Allocated Houdy Rate x 1.5
�Re-Inspection Fees - per hour
$ 176
Inspection for which no fee is otherwise indicated - per hour, 1 hour minimum — Use for Certificate of Occupancy
$ 176
(Additional Plan Review required by changes, additions, revisions to the approved plans.
Fee is per hour with a 1 hour minimum
$ 176
Additional Plan Review Required, applies to 3rd resubmittal (4th overall submittal)
S 176
Use of outside consultants for special plan checking and inspection
Charged at Cost
+ 25% Administration Fee
Permits — Change Ownership/Add Contractor -Per Request
$ 145
Building Permit/Application Reinstatement Fee
$ 200
$ 72
Permit Extension of Time -Per Request
Effective July 1, 2024 Page 2 of 19
Building Division (continued)
Residential Solar Permit 1kW to 15 kW $ 450
Residential Solar Permit over 15kW - Base Amount $ 450
Residential Solar Permit over 15kW - Amt/ kW above 15kW S 10.25
Commercial Solar Permit up to 50kW $ 1,000
Commercial Solar Permit 5lkW— 250kW - Base Amount $ 1,000
Commercial Solar Permit 5lkW —250kW -Amount/ kW above 5lkW �$ 7
Commercial Solar Permit greater than 251kW - Amount/ kW above 25lkW ! $ 5
Special Inspection & Plan Review Fees
Fee for commencing construction without permit(s),
This is in addition to the standard building permit fees. 2 times the permit fee
Development Impact Fees
Building fees per square foot, including garages (enclosed spaces). Single family residential additions of 500 square feet or less are exempt. Water and
Wastewater fees are additional. An increase in meter size resulting from the need to comply with the hydraulic demand associated with Fire Sprinklers is
exempt.
Residential, Single Family
5
Residential, Multi -family
$
Accessory Dwelling Unit
_ $
Non-residential, commercial
$
Non-residential, office
$
_ _
Non-residential, industrial
S
Park fees for residential in -fill lots (per square foot)
Single-family
Single -Family, Detached Accessory Structure
Accessory Dwelling Unit
Multi -family
Public Facilities Fees (per square foot)
Single -Family Residential
General Government
Police
Parks
Fire
Storm D_ rain
Traffic
Multi -family residential
General Government
Police
Parks
Fire
Storm Drain
Traffic
Non-residential, commercial
General Government
Police
Parks
Fire
Storm Drain
Traffic
$
6.28
10.07
1,52
6.37
4,50
2.31
1,95
0,49
0.49
3.25
1.87
0,62
1.95
0.68
0,08
3.01
3.08
1.02
3.25
1.15
0,09
4.69
0.41
0.09
0.03
0.37
0.05
5.36
Effective July 1, 2024 Page 3 of 19
Public Facilities Fees (per square foot) - Continued
Non-residential, office
General Govemment
Police
'Parks
Fire
Storm Dram
Non-residential, industrial
,,General Government___
Government
—... _— $
IS
$.
I�$
s
$
$
Storm Drain $
Traffic $
PLANNING DIVISION
Affordable Housing In -Lieu
Funding assistance application fee
Reasonable Accommodation (ADA) fee (no fee required if in conjunction with other discretionary permit)
Coastal Permits - May be billed at direct cast
Coastal Development Permit (CDP) (Administrative)
Accessory Dwelling Unit (ADU)
Permit In combination with Conditional Use Permit
$
al Permit in combination with PC Design Review
ar CDP Without CUP (Planning Commission) - New single family and single family. additions over 25% in coastal appeals
Multiple Dwelling, Office, Commercial, Convention, Industrial & Institutional $
Additions between 10% and 25% to a Single Family Dwelling in Coastal Appeals area (Planning Commission)
Emergency Permit (excluding required regular CDP)
Other administrative —Tree Removal, private
Environmental - Maybe billed at direct cost
Categorical Exemption
Negative Declaration
Mitigated Negative Declaration, Contracted Out
House MND - Fee per Application
lOutside MND Consultant- Deposit fee oer application
Fee - for environmental document
ount+ 25% administrative fee to be deducted from deposit)
Research Fee — Santa Barbara Central Coast Information Services
No Fee
No Fee
0,52
0.12
0,03
0.50
0.05
3,27
0.14
0.05
0.03
0.12
0.05
1.88
0.42
0.13
0.14
0.02
0.62
878
170
1,664
__-1
15.990
6,923
1,222
673
79
Contract amount
+ 25% administrative fee
7,862
7,862
230
$5,000 deposit
170
Effective July 1, 2024 Page 4 of 19
Sidewalk Vending Permit - Fee for both Initial fee and annual renewal fee
Letter regarding land use confirmation or other research — per hour cost
Development Agreement— charged at fully allocated hourly rates for all personnel involved, plus any outside costs
Extra Planning Commission Meeting
Applicant Requested Continuance
Fine, in addition to permit fee
Appeal of City decision, excluding Coastal Permits in the appeal jurisdiction — refundable if appellant prevails
(Estimated Cost of Appeal is $3,690. The $336 appeal fee denotes 9.1 % cost recovery) _
Telecomm Facility— Administrative (new fee)
$
$
Street name/Rename Processing $
Commercial Cannabis Operating Permit— New $
Commercial Cannabis Operafing Permit —Annual Renewal $
Vacation Rental Monitoring and Administration Fee- annual permit fee $
Conceptual Review Fee — Fee is credited toward any future discretionary permit application within 24 months. Per Application S
Notification Fees
Planning Commission Hearing
Administrative Permit Noticing
PLANNING DIVISION
Sign Permits
Sign Permit
Sidewalk Sign or Dock Sign Permit
Sign Exception (CUP)
Pale Sign (CUP)
Master Sign Program (New Fee)
Master Sign Program amendment
Fines — Temporary, beyond time allowed by Ordinance — per day after no0ce given
Fines — Permanently attached sign w/o permit— per day after notice
Subdivisions
(May be billed at direct cost)
Tentative Parcel Map Application
Tentative Tract Map 0 to 10 lots, add S100.00 per lot over 10 lots, cost per map
Lot Line Adjustment, per application
Certificate of compliance (legal determination) — initial fee covers up to 4 lots.
Additional fee per lot over 4 lots
Lot Mergers
5
391
187
$10,000 deposit
2.573
151
ies the permit fee + plus
day — after notice.
336
182
417
10.416
6,102
709
6.023
541
463
703
373
4,073
4,073
1,511
703
59
59
S
7,888
$
15,246
2.721
$
1,440
I1 $
302
_
$
2,721
Effective July 1, 2024
Page 5 of 19
Text Amendments & Annexations -Maybe billed at direct cost
Zone Ordinance Changes/Local Coastal Plan
If contracted — contract amount+ 25% administrative fee. Fee amount becomes an initial deposit.
i Minor (single section revisions/additions) deposit for cost of staff and outside consultant S 5,787
Major (multiple sections revised/added_ de osit for cost of staff and outside consultant
) P S 11,574
Specific Plan
(Billed as deposit with charges at the fully allocated hourly rates for all personnel involved + any outside costs). If contracted =
cost + 25% administration fee. Fee amount becomes an initial deposit for cost of staff and outside consultant. S 5,787
General Plan/Local Coastal Plan or Zoning Amendment
If contracted — cost +25% administrative fee. Fee amount becomes an Initial deposit
Minor (single section revisions/additions) deposit for cost of staff and outside consultant $ 5,787
Major (multiple sections revised/added) deposit for cost of staff and outside consultant $ 11,574
Planned Development (-PD) Overlay District Plan (processed concurrent with Conditional Use Permit) I minimum deposit fee $10,000
Annexations — Deposit to be determined by staff. Billed at fully allocated staff cost. If contracted — contract amount+ 25%
administrative fee. Deposit for cost of staff and outside consultant $ _ 11,574
Time Extensions
Time Extension -Administrative �$ 345
Time Extensions for Tract Maps and Parcel Maps $ 4.147
Time extension for CUP, regular Coastal Permits and variance. Used after exhaustion of administrative time extensions above
(Planning Commission) S 2,999
USE PERMITS
All use permits may be billed at direct cost at the discretion of the Community Development Director and the scheduled fee would then be deemed as a
deposit. All Projects in the Planned Development Overlay require a Use Permit
Conditional Use Permit (CUP)
CUP for one SFR in a Bluff Area (Planning Commission)
Design Review Permit (Planning Commission)
Design Review Permit (Administrative)
CUP for Occupancy Change in Non-residential Zones
CUP for additions to non -conforming uses, not adding units
I Minor Use Permit
Minor Use Permit for Parking Exception
Use Permit —Longer than 10 days
and sales and outdoor dining use
Temporary Use Permit — 7 consecutive days or 10 non-consecutive days
Revision to Existing Permits (Planning Commission) Major Revision
I Major revision while processing
revision to existing permits (Administrative minor revision)
$ 15,990
$ 8,180
$ 8,181
S 2,721
$ 6,782
S 7,062
$ 2,721
$ 1,181
$ 2,036
S 2,036
S 732
S 10,577
$ 5,944
5 832
Effective July 1, 2024 Page 6 of 19
USE PERMITS -continued
All use permits may be billed at direct cost at the discretion of the Community Development Director
and the scheduled fee would then be deemed as a
deposit. All Projects in the Planned Development Overlay require a Use Permit_
-
iModification (Planning Commission)
$ 6,687
Modification (Administrative)
$ 832
Variance
Variance processed with other permits
Minor Variance
$ 823
Planned Development (-PD) Overlay District Plan
minimum deposit fee $10,000
Document Storage Fee - Planning & Building
First page of plan set $
Fee for each additional page of plan set
First non -plan set page (8 12 x 11 to 11 x 17) $
Fee for each additional non -plan set page $
IMPACT FEES
Water Impact Fees
(Capacity Credit is given for existing meter on previously developed land; not applicable to empty lots.)
Based on Water & Wastewater Impact Fee Update, Bartle Wells Associates, W17115
Less than 1-inch meter
1 inch meter
1-1/2 inch meter
2 inch meter
3 inch meter
WastewaterJmpact Fees
(Capacity Credit is given for existing meter on previously developed land; not applicable to empty lots.)
Based on Water& Wastewater Impact Fee Update, Bartle Wells Associates, 3117115
Less than 1-inch meter
1 inch meter
1-1/2 inch meter
2 inch meter
3 inch meter
Flood Hazard Development Permit (MBMC14.72.040)
Time and materials costs may be added to minimum, when actual cost exceeds the minimum fee (Public Works)
18
8
4,50
1.00
$ 7,912
$ 0,613
$ 21,225
$ 33,962
$ 63,679
$
7,991
10,653
21,354
34,090
63,918
Peril, minimum fee
j
-$ 435
SFR and Duplex
If
Commercial and Mulfi-family up to 112 Acre _ _ _
$ 600
Commercial and Multi -family over 1/2 Acre -
�$ _ 1,000
,Flood plain letter
I $ 192
Effective July 1, 2024 Page 7 of 19
City Engineer Map Review Fees Subdivisions - (Public Works)
Final Map - Tract, minimum fee (MBMC16.24.040J) $ _ _ 7,562
Final Map - Tract, Per lot for every lot over 4 lots $ 293
Final Parcel Maps $5,660
Map Amendment Review, minimum fee $ 1,804
PUBLIC IMPROVEMENT PLANS
Inspections/Plan Review -time and materials costs may be added to minimum, when actual cost exceeds the minimum fee
Public/Subdivision Improvement Plan Check, and Inspection as _aPercentage of the approved Engineers estimate for
7
Subdivision Improvements
Lease Line Adjustment, per application
$
2,555
Abandonment Process:
Street/R-O-W Abandonment Process —�
$
8.490
Summary Abandonment
$
$
4,263
616
Right of Way Dedication, per permit
Encroachment Permits (MBMC13.16-140)
Time and materials costs may be added to minimum, when actual cost exceeds the minimum fee (Public Works)
Regular- Surface Improvements (up to 20 lineal feet; includes inspection)
I g
377
Inspection of Sidewalk, Curb and Gutter, Driveway Aproach, Curb Ramps, Cross -Gutter and Spandrel (each additional 20
lineal
fee beyond initial 20 lineal fee, and includes 2 inspections)
$
218
Regular- Underground Improvements
0-50 Square Feet
S
$
630
850
50-100 Square Feet
100+Square Feet
j 5850+51.50/sf(S200
min.)
_
Special Encroachment Agreement - Private Encroachments into the Public RM/
_
Applicant Provided Eletronic Exhibit 8 1/2" x 11")
S
750
City Provided Electronic Exhibit (8 1/2" x 11")
$
1,483
.Annual Utility Encroachment Permit
5
$
S
4,478
90
16
Wide Load Permit with Traffic Control Plans - Per Year (Set by State of California)
Wide Load Permit with Traffic Control Plans - One Time (Set by State of California)
Temporary Encroachment Agreement
Permit for non -construction activities that encroach into City RAN for a limited time. (e.g., RollofffDumpster, Storage Container,
j
Restricted Parking, etc.)
189
Administrative citation for failure to correct a violation shall be charged per 1.03.050 of the Municipal Code
Streets & Sidwalks
Agreement for Deferral of Improvements (pending City Council approval) - Plus current San Luis Obispo Recording Fees
$
961
Planning and Engineering Development Review Fees
Additional Plan Review Required, applies to 3rd resubmittal (4th overall submittal)
g
168
Effective July 1, 2024 Page 8 of 19
Storm Water Fees (Public Works)
Single
Planni
Buildi
Inspe
Commercial/Multi-Family
Planning review of preliminary stormwater plan, per application
Building permit review of stormwater plan, per permit
Inspection of stormwater facility/erosion control, per application
Trees
Tree Removal Permit (to trim, brace or remove, MBMC12.08.110)
Inspection and Review Fees (Public Works)
Review encroachment permit application exhibit for changes to approved building plans
Additional inspection required after 3 inspections
Fee for commencing construction without permit(s).
This is in addition to the standard Encroachment Permit.
Traffic Control Plan Check Inspection, per submittal
Post -Construction Stormwater Requirements (PCRs) Inspection (Commercial/Multi-Family)
Trench/Asphalt Resurfacing Inspection
0-50 Square Feet
50-100 Square Feet
101+ Square Feet- $1.50 per square foot with $200 minimum fee
Use of Outside Engineering Consultants for Special Plan Checking and/or Inspection
WATER -- --
Meter Installations/ Connections
Water Meter Installation
Bo
x ox Installation/ Replacement
Per meter box, paved/concrete location
Per meter box, unpaved location
Water Meter Re -Read
Reconnection (MBMC13.04.310)
After - Hours Water Meter TuTurnOff/On
Water meter lock and any other damage.:
tampering with City Prop
Family
ng review of preliminary stormwater plan, per application
___ --- 192
ng permit review of stormwater plan, per permit $ 392
ction of stormwater facility/erosion control, per application $ 236
I $ 384
7 S 784
$ 472
S 369
168
168
2 times the permit fee
$ 163
Charged at Cost +25%
Administration Fee
S 217
$ 217
Charged at Cost + 25 %
Administration Fee
Contractor Provides Service Line
Install. Meter install costs $300 plus
.actual cost of parts for city install of
meter and meter box. Partial credit
may apply if staff is able to use
existing pads.
Time and materials
630
399
79
103
685
Effective July 1, 2024 Page 9 of 19
Meter Box Installation/ Replacement - Continued
'Water Meter Testing (Remove, lest and replace meter), per test plus outside cost of testing
Fee refunded if meter test indicates an overage of greater than 2
Water Equivalency Unit (WEU) "In Lieu" Fee - per WEU required In -lieu fee is an alternative for an applicant that does not
provide the WEU offset as required and set by Council Resolution
Fire Hydrants Meter Installation and Removal for Contractor Use (MBMC13 04.360): Rental, per day plus cost of water at
current rate structure.
Hydrant Meter Rental, per day plus cost of water at current rate structure.
Certificate of Compliance — Water Retrofit
WASTEWATER_
Connection Permit- This is in addition to an Encroachment Permit.
Discharge Fee - Tank Trucks and Commercial per truck, for gallon. No septage allowed
Raising Manhole to Grade, fee per manhole
Sewage Spill Cleanup - cost of providing service
Pre -Treatment Inspections
FOG Inspection
FOG Re -inspection
Pre -Treatment Class S annual permit fee
Pre -Treatment Class G annual permit fee
Pre -Treatment Class F annual permit fee
'Other Fees
Dedication 15 Gallon Tree and Plaque
Dedication Bench and 1 Plaque Space
Dedication Whole Bench with 3 Plaque Spaces
Dedication for 1 or 2 Plaque Space(s) on existing Memorial Bench
Other Park Amenity Dedication
TowrFaxi Service Provider Application Fee
,Taxi Operator Permit Application Fee
Taxi Operator Permit Application Renewal Fee
Second Hand Dealer Permit - City Application Fee (does not include Department of Justice fee) (MBMBMC5.40.330)
Second Hand Dealer Permit renewal - City Application Fee (does not include Department of Justice fee) (MBMC5.40.330)
Massage TherapistrPador Permit Application Fee (MBMBMC5.40.330)
Special Events
Permit (each permit)
Special Event Equipment Fee -Per day, Per message board
308
2 x $3,851/WEU required = $7,702
$5 per day and $1,500 refundable
deposit. Water Meter will be read and
billed on a monthly basis.
$ 91
$ 187
$271+ $0.26/gal or fraction thereof
$
187
°ully Allocated Hourly Rate for all staff
nvolved
60
$
$ --
60
$
462
$
44
$
15
Actual Cost of Labor and Parts
Actual Cost of Labor and Parts
Actual Cost of Labor and Parts
Actual Cost of Labor and Parts
1 Be Determined on an individual
basis
S
2,131
$
1.068
$
176
S
1,227
$
333
$
176
Fully Allocated Hourly
Rate for all staff
involved
$
$
91
54
Effective July 1, 2024 Page 10 of 19
Support Services Activity
Digital Photo Reproduction to CD, per device $ 5
AudioNideo Tape Reproduction - per device $ 5
Record Searches/Reviews/Clearance/ Responses - per hour, 1 hour minimum -fee per letter
Officer Activity
Equipment Citation Sign Off
Vehicle Impound Fee Administrative Costs (CVD 22850.5)
Abandoned Vehicle Removal junk vehicles/parts)
Firearms-seizure/storage (PC 33880)
State Mandated Costs
$ 79
$ 17
$ 225
$ _ - 225
$ 148
Concealed Weapons Permit (does not include DOJ or other fees (PC25455), fee per permit.
-($20 of permit fee is paid at time of application with remaining $80.00 amount paid upon issuing of permit)
-Psychological testing costs are added to the above fees up to $150. Permit requires fingerprinting.
'Fees set by California Penal Code Sections 12050-12054 and 26190a $ 130
Renewal of Concealed Weapons Permit (does not include cost of ID card)
'Fees set by California Penal Code Sections 12050-12054 and 26190a
Renewal Permit $ 28
Amended Permit j $ 11
Subpoena Duces Tecum (does not include costs of report, etc) (EC 1563(b)(1))
Subpoenaed Non-Swom-Fee per day plus $0.20 per mile (California Government Code Section 68093)
$ __ 41
Full cost to the public entity incurred in
paying the peace officer his or her
Subpoenaed Peace Officer— (California Government Code 68097.2) salary or other compensation and
travel expense for each day that such
officer is required to remain in
attendance
Subpoena Duces Tecum (California Government Code Section 1563(b)(6) $ 17
Delinquent Parking Citation Copy, per page (VC 40206.5) $ 0A0
Repossessed Vehicle (set by California GC 41612) $ 15
Live Scan Fingerprint Fees (PC 13300(e))-per request
Cost Recovery
Per Government Code Section 53155,
Dcharge the actual costs incurred up to
DUI Emergency Response (MBMC3.40.030)
$12,000 per response for all
responding personnel.
False Alarm Response (after 3rd false alarm In a year) (MBMC 9.22.020)
1 st response within a year No Charge'
2nd response within a year No Charge
3rd and subsequent response within a year $ 449
Commercial Cannabis business — Initial employee background investigation fee for each regular employee investigation
conducted.
Commercial Cannabis business -Annual employee background investigation renewal fee for each regular employee
investigation conducted. $ 272_
Commercial Cannabis business — Initial owner background investigation fee for each owner investigation conducted. $ 671
Commercial Cannabis business — annual owner background investigation fee for each owner investigation conducted. $ 336
Effective July 1, 2024 Page 11 of 19
Permit Inspection Fees
Any single permit identified in Title 24 CFC and not specifically addressed in the Master Fee Schedule, cost per permit.
Not to Exceed total for any combination of pennits
Special Occurrence or Use Permit (equipment & personnel charges additional)
Equipment & Personnel Charges
Engine or Truck: per hour, per vehicle (personnel charges additional)
Squad/Rescue: per hour, per vehicle. (personnel charges additional)
Vehicle: per hour, per vehicle (personnel charges additional)
charges-
S 333
S 1,302
S 177
S 156
S 113
S 54
Per hour, per person - 2 hour
minimum, unless otherwise specified,
at current productive hourly rate
Plan Review Fees
Fire Plan Concept Review Fully allocated hourly rate with not
charge for first 15 minutes.
011 of total valuation plus use of
Plan Review fee for valuation $1 to $1,000,000 outside consultant for Plan Review &
Inspection based on actual cost
Plan Review for valuation over $1,000,000 0025 applies to portion of valuation
over 51,000 000
'Personnel charges as specified in
Additional Plan Review required by changes, additions or revisions to approved plans Equipment 8 Personnel Charges, on
an hourly basis, plus actual cost of
outside consultant for Plan Review
Fire Protection
Fire Sprinkler System Installation Inspection
(above ground)
Residential
$ 225
$ 337
Commercial: Base fee + $15.25 per head
Commercial projects or tenant improvements under 1,000 sq. ft. Base fee + 15.25 per head
$ 225
Fire Sprinkler System Installation Inspection
(above ground) (continued)
Use of Outside Consultants for Plan Review & and/or Inspection. Base fee plus actual cost
$ 230
Request for Building Fire Flow Calculations
$ 455
Request for Hydrant Flow Information
$ 230
_
Request for Hydrant Flow Test
$ 89
Base fee plus personnel & equipment as specified in Personnel and Equipment Charges, 1 hr min
Fire & Safety Inspection Program:
Fees collected through Business Licensing
_
$ 47
B2 Business Inspection (4 yr Self Inspection Program)
Noni Business Inspection (Annual Inspection)
$ 166
Effective July 1, 2024 Page 12 of 19
1 st and 2nd inspections No charge
3rd and subsequent inspections $ 411
Annual weed and hazard abatement fees
1st inspection
No charge
2nd and subsequent inspections
S 230
Administrative citation for failure to correct a violation shall be charged per 1.03.050 of the Municipal Code
Incident Response Fees
Negligent Incidents:
Personnel charges, as specified in
Response due to negligent/malicious act (e.g., DUI traffic accident, climber on Morro Rock, incendiary fire, negligent hazardous
Equipment & Personnel Charges, plus
acluals cost of materials & outside
material incident, negligent confined space incident, etc.)
services
Excessive or Malicious False Alarms:
Personnel charges, as specified in
Emergency response due to "Failure to Notify" when working on or testing fire/alarm system
Equipment & Personnel Charges, 0.5
hours min
Personnel charges, as specified in
Alarm system malfunction resulting in 2 in 30 days or 3 in 12 months
Equipment & Personnel Charges, plus
actuals cost of materials
Other Fire Services
Cause & Origin investigation reports, per report
Non -renewal of required annual permit
Failure to obtain permit
Missed site inspection appointment
Failure to meet permit requirements/requiring re -inspection
Administrative citation for failure to correct a violation shall be charged per 1.03.050 of the Municipal Code
Permits - California Fire Code
See operational and construction permits identified in the California Fire Code, Section 105
Plan Review Fees
$ 435
Charge double permit fee rate
Charge double permit fee rate
$ 230
$ 230
All Plan Review Fees shown are minimum amounts, based on average processing. Large or complex projects may be subject to increased fees based upon time
costs, or equipment costs as shown per Equipment & Personnel Charges.
Plan Review Personnel charges, as specified in
Equipment & Personnel Charges
Charged at Cost
Use of outside consultant for Plan Review and/or Inspection + 25 / Administration Fee
Effective July 1, 2024 Page 13 of 19
All fees are due in advance. At the Harbor Department's discretion, billing in arrears for qualified and registered vessels with current account status may be
allowed. Any account past due over 10 days will be charged a $35 late fee monthly. Accounts are due and payable by the 10th of every month.
Vessel Fees
1. All vessel fees based on the length of the vessel or the length of the slip, whichever is greater, with a 36-foot minimum.
,2. The Harbor Director may waive dockage fees for "tall ships" visiting Morro Bay Harbor for any period less than 30 days with written notice.
3. Transient Slip fees will be charged by the day or by the month, whichever is less and are not refundable.
n. i ransienr Snip mommy surceases snan oe mmneo to s monms in any slip as iong as mere are vessels appiopnare to me slip 51LU un nie bumease Waning nsr.
5. Anchorage stay limited to 30 days in any 6-month period.
Fee Name
FY 2024-25
Fee Amount
Commercial Fishing Slips — monthly rate per foot.
$
8
Commercial Fishing Slip Waiting List Deposit
$
435
Head Float Berth — monthly rate
$
290
Skiff Storage Fee —annual rate
$
100
Transient Slips — monthly sublease rate per foot
Commercial
$
12.55
Non -Commerical Fishing
$
15.60
Transient Slips — daily rate per foot
Commercial
$
1.14
Non -Commerical Fishing
$
1.76
T-Piers — daily rate per foot
$
0.52
A1-5 Anchorage Area —first 5 days
$
-
A1-5 Anchorage Area —daily rate/foot over 5 days. Reduced to match demand.
$
0.41
Temporary Moorage — large vessels or equipment requiring special accommodation or assistance — per foot
2.00
Impound Fee
$
258
Impounded Vessels — daily storage rate per foot
$
2.00
Service Fees
1. South T-Pier Hoist may only be used for fish unloading only in certain cases; see Harbor Department Rules
and Regulations.
2. Dry Storage fee is for use of each approximate 12-foot by 30-foot space.
3. Triangle Lot Boat Storage fee is for use of each approximate 12-foot by 30-foot space; monthly
T-Pier Electrical Convenience Fee — daily rate
$
4
South T-Pier Hoist— rate per use
$
20
South T-Pier Hoist Fish Unloading — per hour
$
102
Wharfage — rate per ton
$
1.35
Emergency Equipment Replacement
$
222
Dry Storage — daily rate
$
10
Dry Storage — monthly rate
$
120
Triangle Lot Trailer/Boat Storage — monthly rate
$
120
Launch Ramp Haul Out - per foot
$
10
Administrative Citations
,Administrative citation for failure to correct a violation shall. be charged per 1.03.050 of the Municipal Code
Effective July 1, 2024 Page 14 of 19
Guest Mooring stay limited to 30 days in any 6-month period without prior approval of the Harbor Department.
City Moorings —monthly rate (No CPI applied; set to market) $ 340
Private Moorings —monthly rate I $ 115
Guest Moorings — daily rate per foot (No CPI applied. Set to market) $ 0.45
Mooring Ownership Transfer— private moorings $ 1,523
Liveaboard Fees
1. Liveaboard permits are valid for 2 fiscal years. Any Liveaboard application, submitted during the period January 1 through June 30, is valid only for that fiscal year
and the following fiscal year. Any Liveaboard application, submitted July 1 through December 31, will only be valid for the remainder of that fiscal year and the
following fiscal year.
2. Liveaboard Permit Inspections may be conducted by the Harbor Patrol or by a qualified Marine Surveyor acceptable to the City.
Liveaboard Permit Administration - Monthly
$
55
Liveaboard Permit Inspection— Biennial (if done by Harbor Patrol)
$
177
Personnel charges,
as specified in
Missed Liveaboard Permit Inspection Appointment (if done by Harbor Patrol)
Equipment & Personnel
Charges, 30-
minute min
Equipment & Personnel Charges
1. Vessels requiring non -emergency assistance may be charged at the rates established herein.
J
2. Personnel and vessels/vehicles charged on an hourly basis with a 1-hour minimum (2-hour minimum for hazardous material removal)
Vessel — per hour (personnel charges additional)
$
110
Vehicle/Rescue Watercraft— per hour (personnel charges additional)
$
55
Her hour, per person
— 1 noun
Personnel Charges
minimum, unless otherwise
specified,
at current productive hourly
rate
Launch Ramp Parking Fees
1. All daily parking fees are calculated per calendar day or any portion thereof.
2. Annual Parking Permits are valid for one calendar year and may be prorated to the nearest month.
Daily Permit -Tow Vehicle & Trailer Spaces
$
10
Annual Permit - Tow Vehicle & Trailer Spaces
$
175
Failure to Pay Established Fee
3
60
Failure to Visibly Display Receipt
$
60
Daily Permit- Single vehicle spaces
S
5
Annual Permit - Single vehicle spaces
S
175
Lease Administrative Fees
i
New Master Lease Negotiation & City Council Approval
$
3.440
Other Actions Requiring City Council Approval (lease amendment, lease assignment & assumption, deed of trust approval,
{
1 $
1,694
lease line adjustment, license agreement, consent of landowner, approval, building lease approval)
Sublease Approval
�$
484
Miscellaneous Fees
I
Cruise Ship Passenger Landing Fee, per passenger ($5,000 minimum) _ $ 10
Negligent Incidents: 'Personnel charges as specified in
Response due to negligent/malicious act e. Boating DUI, Climber on Moro Rock, Unsafe Boating, Negligent Hazardous Equipment & Personnel Charges, 2-
P( 9. 9.
Material Incident, etc.) hour min, plus arvic s cast of.
materials & outside services
Personnel charges, as specified in
Plan Check Equipment & Personnel Charges, 30-
minute min
Effective July 1, 2024 Page 15 of 19
The Recreation Services Manager shall set Resident/Non-Profit and Non-ResidenUFor-profit fees for Recreation Services activities and programs
Facility Rentals
Community Center
Auditorium - Per Hour (ResidenV Non -Profit Groups) $ 1
Auditorium - Per Hour (all Other)
$ 1
Auditorium, one-half- Per Hour(Resident/ Non -Profit Groups)
I $
Auditorium, one-half- Per Hour (all Other)
$
Multi -Purpose Room- Per Hour (Resident/ Non -Profit Groups)
$
Multi -Purpose Room - Per Hour (all Other)
$
Lounge - Per Hour (ResidenV Non -Profit Groups)
$
Lounge - Per Hour (all Other)
$
Studio- Per Hour (Resident/ Non -Profit Groups)
$
Studio - Per Hour (all Other)
$
Conference Room - Per Hour (ResidenV Non -Profit Groups) _
1$
Conference Room - Per Hour (all Other)
$
Note: Kitchen only rentals permitted Monday- Friday, weekend rentals must be combined with mom rental. (Resident Non -Profit Groups)
09
63
66
97
60
91�
49
72
37
54
19
31
Kitchen - Per Hour (Resident/ Non -Profit Groups) $ 30
Kitchen - Per Hour (all Other) $ 37
Kitchen - 8 Hours (ResidenV Non -Profit Groups) $ 152
Kitchen - 8 Hours (all Other) $ 182
Veteran's Memorial Building
Assembly, w/o kitchen- Per Hour (Resident/ Non -Profit Groups)
Assembly, wlo kitchen - Per Hour (All Other)
Complete, w/o kitchen - Per Hour (Resident/ Non -Profit Groups)
Complete, w/o kitchen - Per Hour (All Other)
Meeting, w/o kitchen - Per Hour (Resident( Non -Profit Groups)
Meeting, w/o kitchen - Per Hour (All Other) I $
Kitchen & barbeque - Per Hour (Resident/ Non -Profit Groups) $
Kitchen & barbeque - Per Hour (All Other) $
Note: Kitchen only rentals permitted Monday- Friday; weekend rentals must be combined with room rental (Resident Non -Profit Groups)
Kitchen - 8 hours (Resident/ Non -Profit Groups) S
Kitchen - 8 hours (All Other) $
Processing Fees
49
64
54
72
41
53
29
37
152
182
Rations 20% of invoiced costs
led Permit Fee -Non Refundable - 3 54
e House $ 43
it/Security $ 43
Special Event/Festival Processing Fee (all public space rentals) - Per Event, Non-refundable $ 418
Special Event Processing Fee - Per Event, Non-refundable $ 150
Effective July 1, 2024 Page 16 of 19
;Security Deposit
The City reserves the right to require additional security deposit limits at its discretion.
No alcohol and no live music
Alcohol and/or live music
Alcohol and/or live music aver 200 people
Bounce House Deposit
Organized Sporting Event (tournaments) Deposit
Public Special Event/Festival Deposit
Photography/Filming Deposit
Facility Fees
(non-refundable, per event based on group Size)_
100-200 participants
201 or more participants
Event set-up, per hour
Event break down, per hour
Veteran's Memorial Building stage use, set-up and breakdown, flat rate
Facility Attendant(s): per hour each
Security Guard(s): per hour each (Required for events with alcohol and/or dancing)
Unscheduled overtime, per hour
Insurance
Hourly and Park Use Fees
Four-hour and Full Day Fees Apply to the Following Areas
Anchor Memorial Park Open Area
Bayshore Bluffs Open Area
Centennial Parkway Open Area
City Park Open Area
Cloisters Park Open Area
Franklin Riley Park
General Open Area
Monte Young Open Area
Tidelands Park Open Area
Coleman Park
Coleman Basketball Courts
Del Mar Park Basketball Courts
Del Mar Pickelball Courts
Del Mar Tennis Courts
Del Mar Park Hillside or Meadow
Lila Keiser Park BBQ (Excluding Tournament Use)
. Monte Young Tennis Courts
i S 250
_I $ 0
$ 00000
100
$ d 500
- __. 500
199
$ 411
$ 60
$ 60
$ 120
$ 27
�S 38
cost based on event size/type
Effective July 1, 2024 Page 17 of 19
Hourly and Full Day Fees
Fee for Four Hours (ResidenV Non -Profit Groups)
Fee for Four Hours (All Other)
Full Day Fee (ResidenV Non -Profit Groups) $
Full Day Fee (All Other) _ $
Individual Location Rates
Lila Keiser Park Tournament Use (does not include field prep, or hourly use rates) - (ResidenV Non -Profit Groups) $
Lila Keiser Park Tournament Use (does not include field prep, or hourly use rates) - (All Other) $
Skate Park - Per Hour(2 hour minimum) - (ResidenV Non -Profit Groups) $
Skate Park - Per Hour (2 hour minimum) -AII Other) $
Public Special Event/Fesfival (ResidenV Non -Profit Groups) $
Public Special Event/Festival (All Other)
Morro Beach Private Recepfion/Event— up to 100 people (ResidenV Non -Profit Groups) $
Morro Beach Private Reception/Event — up to 100 people (All Other) $
Mono Beach Private Reception/Event — beyond 100 people (ResidenV Non Profit Groups) $
Mono Beach Private Reception/Event — beyond 100 people (All Others) $
Morro Rock Parking Lot— Available only for public special events (non-exclusive use) (ResidenV Non -Profit Groups) $
Morro Rock Parking Lot —Available only for public special events (non-exclusive use) (All Other) $
!Park Use Fees
i Giant Chessboard —Wooden Pieces (ResidenV Non -Profit Groups) -
Giant Chessboard — Wooden Pieces (All Other)
Giant Chessboard — Plastic Pieces (ResidenV Non -Profit Groups)
Giant Chessboard— Plastic Pieces (All Other)
Basketball Courts, Pickleball Court & Tennis Court Hourly (ResidenV Non -Profit Groups)
Basketball Courts, Pickleball Court & Tennis Court Hourly (All Other)
.Lila Keiser hourly field rental w/o lights (ResidenV Non -Profit Groups)
Lila Keiser hourly field rental w/o lights (All Other)
Lila Keiser hourly field rental w/ lights (ResidenV Non -Profit Groups)
Lila Keiser hourly field rental w/ lights (All Other)
Lila Keiser field preparation
Lila Keiser Support Services, per hour
Park Banner Placement, per week (ResidenV Non -Profit Groups)
Park Banner Placement, per week (All Other)
Miscellaneous Property Use _
Photography/Filming — Per Day (ResidenV Nan -Profit Groups)
— Per Day (All Other)
97
120
291
362
645
1,290
90
120
645
1,290
242
362
362
544
362
544
52
104
14
22
9
13
9
13
24
37
49
34
152
212
645
1,289
Effective July 1, 2024 Page 18 of 19
Morro Bay Transit - Fixed Route (Short Range Transit Plan)
Regular fare, per ride
S
1.50
Discount fare, per ride
S
0.75
Regular punch pass (11 rides for the price of 10)
$
15
Discount punch pass (11 rides for the price of 10)
$
7.5
Regular day pass
$
4
Discount day pass
_.______ _—
$
2
.._____._—__
Morro Bay Transit -Call-a-Ride
_
Fare. per ride
$
2.5
Call -A-Ride punch pass (11 rides for the price of 10)
$
25
Morro Bay Trolley Fares (Ages 12 and up)
Per ride (Children under 12 years old ride free, but must be accompanied by a fare -paying adult)
1
Morro Bay Trolley Advertising
_ _ �$
Exterior Side of Trolley (approx. 36"x20") - with supplied sign
$
485
Exterior Rear of Trolley (approx. 24"x20") - with supplied sign
441
Interior (approx. 26"x12") - with supplied sign
$
208
Effective July 1, 2024 Page 19 of 19